Northeast India’s Only English and Hindi Satellite News Channel

PM Modi to inaugurate Sela Tunnel near LAC in Arunachal-China border by year end

First Published: 27th September, 2023 21:11 IST

The Sela Tunnel project involves two main tunnels: an escape tunnel and a link road. The first tunnel is 993 metres long and the second tunnel is 1,591 metres long

The strategically important Sela Tunnel in West Kameng district of Arunachal Pradesh near the Line of Actual Control (LAC) with China is nearing completion. Prime Minister Narendra Modi is expected to inaugurate the Tunnel by this year end, officials said.

Constructed by the Border Roads Organisation (BRO), the Sela Tunnel will provide all-weather connectivity to Tawang district, bordering China and other forward areas throughout the year, enhancing the strategic and operational capabilities of the Indian Army.

The tunnel is being excavated below the 4,200-metre Sela Pass, which is often closed due to snowfall and landslides.

Once complete, the tunnel will reduce the distance between Dirang and Tawang by 10 kilometres and the travel time by an hour.

The idea of constructing a tunnel below the Sela Pass was first proposed in 2008 by then-Arunachal Pradesh Chief Minister Dorjee Khandu. The project was approved by the Cabinet Committee on Security in 2018, and the foundation stone was laid by Prime Minister Narendra Modi in February 2019.

The Sela Tunnel project involves two main tunnels: an escape tunnel and a link road. The first tunnel, which is 993 metres long, cuts through a longitudinal ridge, and after emerging, a second tunnel, 1,591 metres long, runs through the main Sela-Chabrela ridge.

The two tunnels together bypass the Sela Pass and maintain an elevation of 3000 metre. There is an escape tunnel that runs parallel to the 1591-metre tunnel. It may be mentioned here that the escape tunnel has been constructed to facilitate rescue work if an emergency situation arises. The escape tunnel is connected to the main tunnel by six Cross-passages.

The project also involves the construction of an approach road of 7.2 km to Tunnel 1, which takes off from BCT Road, and a link road of 1.2 km that connects Tunnel 1 to Tunnel 2. The total length of the project, including the tunnels, the approach, and the link roads, will be around 12 km.

The project also includes state-of-the-art control rooms to control all the traffic and remotely control all the other essential services in the tunnels with the help of SCADA, a firefighting system, ventilation facilities, a lighting system, and a communication system. The road and the tunnels are constructed for two-way traffic.

Also Read : AFSPA extended in parts of Nagaland and Arunachal by another 6 months

COMMENTS

Leave a Reply

Your email address will not be published. Required fields are marked *

WE RECOMMEND

Banner
Mob Storms Police Station in Arunachal, Drags Youth Accused of Raping Around 20 Girl Students Out, Lynches Him

As per inputs, the youth was accused of raping at least 20 students and molesting over 3 others aged between 6-8 years from Mount Carmel School, Roing.

11th July 2025
Banner
SIFF Opposes PMO-Level Meeting on Siang Upper Multipurpose Project to be Held in New Delhi

The impasse over the Siang Upper Multipurpose Project (SUMP) is not ending anytime soon. The project affected families are now strongly opposing the proposed PMO-level meeting to be held on July 15 in New Delhi. The meeting will chaired by Principal Secretary to the Prime Minister, Dr P.K.Mishra. The Siang Indigenous Farmers’ Forum (SIFF), a […]

11th July 2025
Banner
Why Do Monks Burn Herbs on Mountain Peaks? Here’s All About Arunachal’s Sacred Smoke Ceremony

The ritual also served to invoke protection for the remote borderland and foster well-being for all.

11th July 2025
Banner
Former Arunachal MLA Kapchen Rajkumar Dies In Wild Elephant Attack in Tirap

According to family members of Rajkumar, the attack took place in the early morning hours between Namsang and Deomali area

09th July 2025
Banner
Arunachal Govt Holds High Level Meeting with AAPSU on Chakma-Hajong Refugee Issue

The talks follow AAPSU’s protest rally held on June 16, during which a memorandum was submitted to the Union Home Minister, Amit Shah

09th July 2025