Northeast India’s Only English and Hindi Satellite News Channel

India May Face Potential Evening Power Shortages By 2027, Warns IECC

First Published: 31st July, 2024 12:21 IST

India's electricity demand grew by 7 per cent in 2023, significantly outpacing the global average of 2.2 per cent

India may experience significant evening power shortages by 2027, ranging between 20 and 40 gigawatts (GW), even if all currently under-construction thermal and hydroelectric capacity becomes functional as planned, according to the India Energy and Climate Center (IECC).

The IECC further said that if electricity demand continues to grow at an annual rate beyond 6 per cent, India will face evening power shortages by 2027.

It observed that India’s electricity demand grew by 7 per cent in 2023, significantly outpacing the global average of 2.2 per cent.

Between May 2019 and May 2024, India’s peak electricity demand surged by 68 GW, from 182 GW to 250 GW, marking an annual growth rate of 6.5 per cent.

The country met a record maximum power demand of 250 GW on May 30 this year.

The post-COVID period saw an even more dramatic increase in demand, with peak levels jumping by 46 GW in just two years, from 204 GW in May 2022 to 250 GW in May 2024.

Interestingly, the report mentioned that during a recent heat wave from May 17 to May 31, 2024, India’s power system faced significant stress. Despite having over 140 GW of renewable energy (RE) capacity (excluding large hydro), only 8-10 GW of RE generation was available during evening peak periods in early May 2024.

India’s power sector is poised for robust growth in the fiscal year 2025, with expectations of a healthy demand surge at approximately 6.0 per cent this fiscal.

The report highlighted the urgent need for policy intervention to avert these shortages. It suggested that deploying storage solutions combined with solar power could mitigate the risk.

Evening peaking RE would be critical for increasing deployment by states and could work alongside technology-neutral procurement obligations for utilities.

The report also recommended achieving a solar-plus-storage cost target of Rs 3/kWh by 2027, noting that SECI (2024).

Also Read: Meghalaya: Erratic power supply irks residents in Mawhati constituency, MLA meets Power Minister

COMMENTS

Leave a Reply

Your email address will not be published. Required fields are marked *

WE RECOMMEND

Banner
Shubhanshu Shukla Speaks to Students from Assam and Meghalaya from Space, Tells Them He Will Guide Them To Become Astronauts, Walk on the Moon

The Indian astronaut connected with the students using amateur (Ham) radio, making it a rare and inspiring moment.

11th July 2025
Banner
Space Menu Goes Desi: Gajar Ka Halwa Wins Over International Astronauts

The sweet surprise, specially developed for space consumption by ISRO and DRDO, was the centrepiece of a lively gathering aboard Axiom Mission 4.

11th July 2025
Banner
Is Another GLOF Ticking in Sikkim? South Lhonak Lake Once Again Placed in Highest Risk Category

The lake has now refilled to the same dangerous level, raising serious concerns

11th July 2025
Banner
Delhi HC stays release of Udaipur Files movie

The petitioners argued that the film's release could disturb communal harmony and pose a serious threat to public order, given the sensitive nature of the subject.

10th July 2025
Banner
Killed For Making Reels? State-Level Tennis Player Radhika Yadav Shot Dead by Father in Gurugram Home

Tennis Player Radhika Yadav: Police officials have confirmed that the father has been arrested and weapon used in the crime has been seized.

10th July 2025