Flood Crisis in Byrnihat’s Umpher: MLA Sohtun to Seek CM Sangma’s Intervention for Assam-Meghalaya Drainage Coordination
First Published: 28th May, 2025 19:03 IST
Flood Crisis in Byrnihat’s Umpher: MLA highlighted that Umpher village gets flooded because of inadequate drainage on the Assam side.
Concerned about the recurring floods devastating Umpher village in Byrnihat, Jirang MLA Sosthenes Sohtun has said that he will personally speak to Chief Minister Conrad K. Sangma and request him to initiate a dialogue with the Assam government for a solution.
The MLA highlighted that Umpher village gets flooded because of inadequate drainage on the Assam side of the border, impacting residents on both sides. He stressed the need for a coordinated drainage expansion plan involving both states.
“To address the issue of cleaning the stream within Assam’s jurisdiction, I will speak with Meghalaya Chief Minister Conrad K. Sangma and request his intervention,” Sohtun said.
Meghalaya and Assam will have to work together. “This collaboration is essential to finding a permanent solution to the recurring flash floods,” the MLA said.
The proposed dialogue between the two governments is expected to pave the way for joint infrastructural improvements and long-term relief for flood-prone areas like Umpher, ensuring that residents and educational institutions are no longer disrupted by seasonal disasters.
The frequent flooding has severely affected several households and the St. Jude Secondary School.
MLA Sosthenes Sohtun, along with the Deputy Commissioner of Ri Bhoi, Abhilash Baranwal, and officials from NHAI and PWD, conducted an inspection of the flood-affected areas today.
During the inspection, they were accompanied by teachers from St. Jude Secondary School and local village leaders, who showed them the persistent hardships caused by the floods in the area. They earnestly appealed to the visiting officials to take immediate steps to widen the drainage systems in the locality to prevent further flooding.
MLA Sohtun and DC Baranwal assured the public that swift action would be taken to address the issue. They emphasized that work would commence soon to mitigate the impact of heavy rainfall, ensuring that residents of Umpher no longer suffer flood-related damages to their homes and properties.
They also committed to finding a permanent solution to the flooding problem, which has become a regular challenge during the monsoon season.
COMMENTS

TOPMOST STORY NOW

Live Brother of BSF Jawan Deepak Chingakham Who Died in Cross-Border Firing by Pakistan in Jammu Appointed ASI in Manipur Police on Compassionate Grounds
11th July 2025
Live Maikhuli Villagers Protest MoU Over Assam-Meghalaya Border, Demand Return of Fishery
11th July 2025
Live Chhangur Baba Received Rs 500 Crore in Foreign Funds for Illegal Conversions: Anti-Terror Squad
11th July 2025
Live Taiwan Detects 9 Chinese Warships, 1 Aircraft Breaching ADIZ Amid Rising Tensions
11th July 2025WE RECOMMEND

Maikhuli Villagers Protest MoU Over Assam-Meghalaya Border, Demand Return of Fishery
At the heart of the protest lies the contentious inclusion of the village's long-maintained fishery within Assam’s territory under the MoU.
11th July 2025
Shubhanshu Shukla Speaks to Students from Assam and Meghalaya from Space, Tells Them He Will Guide Them To Become Astronauts, Walk on the Moon
The Indian astronaut connected with the students using amateur (Ham) radio, making it a rare and inspiring moment.
11th July 2025
Shillong Cantonment to Finally Get Building Bye-Laws After 53 Years; Draft Sent to Defence Ministry for Approval
As per the approved draft, residential buildings along motorable roads can go up to Ground plus 3 (G+3) floors.
11th July 2025
Centre Sanctions Rs 1,066 Cr For Flood And Landslide Hit Assam, Manipur, Meghalaya and Mizoram
These states have experienced heavy rainfall, massive flooding, and multiple landslides during this monsoon season.
10th July 2025
Shillong Gets Its First Mall: Finance Minister Nirmala Sitharaman Inaugurates Rs 100 Cr Polo Commercial Complex
Meghalaya: Rooftop solar panels and rainwater harvesting systems further underline the eco-conscious vision of the project.
10th July 2025